In the past 5 years alone, the global air traffic demand has increased with more than 30%. In order to meet the increasing demand of her clients, the current production process of a large player in the aerospace industry, needs to be scaled up. In this project, the production process of a tail-piece needs to be partitioned into sub-processes. From serial to parallel. The assignment: Let Neitraco, by her lead and mechanical engineers, develop a number of high-tech sub tools, based on the existing main tool for an aircraft tail-piece.